Site preparation for the new laboratory building began in late November with the removal of MDIBL's seasonal bathroom. The trench above was dug through the former site of the seasonal bathroom and will hold the electrical wires that power the lower labs. Relocating the wires was necessary as they previously ran through the footprint of the new laboratory building. Please click on the images for larger pictures.
Site preparation work will continue for the next few weeks. Major tasks include finishing the rerouting of various systems and moving the Studies and Isotope Shed to their new sites.
|