Shingled Siding

As the fall progressed, crews added cedar shingles to the new laboratory building.

Siding
A picture of the siding as it is applied to the new building. From left to right is the foam insulation, plywood subsiding, and shingled outer siding.
Siding
siding 2
Shingles climb up the building.
A closer view of the siding.
Siding
The back of the building, nearly complete.

back